High Speed 2: On the right tracks

The size and complexity of the HS2 rail project means there is plenty for insurers to get their teeth into - but will the inherent technical risks outweigh the potential benefits? Download Post's article to find out more.

Topics covered:

• Litigation in waiting: How can HS2 avoid contentious claims?

• Joint Code of Practice for Risk Management of Tunnel Works.

• Why did the London Engineering Group develop a new wording for tunnel works?